Monday, 9 November 2009

Extended Filming

At the moment we have 7 seconds of footage gap to fill. To fix this we've decided to add in close up shots from the previous footage we shot. However we did encounter some issues while analysing the drawbacks from this decision. If we insert clips at different intervals our sequence, this may ruin the lyrical/visual relationship. In other words, we'll have to reiterate the lyrics from the song and listen to the track so we can find out which parts of our sequence can be edited.

For now we've decided to improvise another idea involving the black sky with scattered stars. This is because our scene before the gap starts from the sky. This will keep the continuity in flow while filling up the time line of the entire song. In any case of running out of lesson time. We've been given the opportunity to book an editing evening this week. We've chosen Thursday as the entire college have a day off so we'll keep this session booked in case we don't manage to finish by Wednesday.





*UPDATE*

We managed to fill the gap entirely with out including the close ups. Even though we neglected the feedback mentioned by our peers. We were able to get every scene to match with the song's lyrics. Our priority now is to fix the lighting by tampering with the available filters. Another advisable move would be to ask our teacher for some feedback before final submission as we still have the spare evening slot and Wednesdays lesson.

No response to “Extended Filming”

Leave a reply

 
© 2009 GROUP 11 - Music Video 2009/10. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz